Saudi Aramco Schedule G Fixed -
If you are an older contractor referencing "Schedule G" requirements on a modern contract, you may be using outdated specifications. Today, the characteristics of the old Schedule G are found under Schedule D codes. It is vital to check the Material Master Data sheet provided in the Inquiry to see the current ARS code.
For contracts over SAR 5 million ($1.33M), designate a senior manager responsible for submitting monthly Subcontractor Utilization Reports (SURs) to Aramco’s Contracting Group.
Contractors must provide cost comparisons to justify sourcing decisions if choosing non-local options. Materials Management System
Saudi Aramco Schedule G requires looking at it through the lens of operational readiness and safety compliance. In the offshore drilling and oilfield services industry, Schedule G is the definitive benchmark for Health, Safety, and Environmental (HSE) Requirements Operational Review: Saudi Aramco Schedule G Compliance 1. Comprehensive Safety Framework saudi aramco schedule g
: Utilize advanced HRIS systems integrated with the Saudi MHRSD portal to track Iqama expirations, WPS compliance, and Nitaqat status in real-time.
Schedule G: Materials and Equipment Guidelines | PDF - Scribd
At the end of the project, the "story" concludes with a rigorous reconciliation. Any unused Company-supplied materials must be documented, packed, and returned to a designated Aramco location before the contract can be fully closed out. Key Components of Schedule G If you are an older contractor referencing "Schedule
Promptly report all incidents, near-misses, and injuries.
: Saudi Aramco conducts unannounced audits of contractor camps and worksites. Non-compliance can result in heavy financial penalties or the suspension of work.
: Life Cycle Costing (LCC) requirements for specific major equipment. Operational Responsibilities For contracts over SAR 5 million ($1
Contractors may be penalised if they fail to comply with these local sourcing requirements. Standard Attachments
How to handle, safeguard, and return unused items at the end of the project. Key Compliance Pillars