Gunnebo Speedstile Fl Installation Manual ((new)) Jun 2026
Check the NC jumper link or the fire alarm relay connection.
Locate the main control board (usually designated as the GM Board).
[ LANE 1 MASTER CABINET ] [ LANE 1 SLAVE CABINET ] +---------------------------------+ +---------------------------------+ | [Mains AC] [Intercom] [Access] | | [Inter-Cabinet Sync Bus Cable] | +---------------------------------+ +---------------------------------+ | | | | v v v v ----------------------------------------------------------------- UNDERFLOOR CONDUIT ROUTING ----------------------------------------------------------------- Cabling Specifications 3-core copper cable (
Test the control board by jumpering the GND and Open A terminals manually with a wire snippet. If it opens, troubleshoot your access control reader wiring. Mechanical binding or loose drive belts. gunnebo speedstile fl installation manual
Cables must rise from the foundation into the designated shaded areas within the cabinet base. Conduit Depth : Conduits should run at least 140mm below finished floor level. Conduit Rise : Conduits must rise at least 50mm from the foundation to prevent water ingress. Conduit Diameter : Use a minimum diameter of Power Supply : Standard operation requires 230Vac / 50Hz (115Vac available as an option). Power rating is roughly 120VA on standby 300VA during operation Fichet Security Solution 3. Installation Steps Gunnebo SpeedStile FLS Installation Guide | PDF - Scribd
Terminate the reader relay output across the designated GND and Open A terminals.
Requires a voltage-free contact input to trigger the fail-state (opening the leaves) in emergencies. Gunnebo SpeedStile FL Check the NC jumper link or the fire alarm relay connection
Strip the wires and terminate them directly into the internal terminal block, ensuring Earth (Ground), Neutral, and Line are connected properly.
Standard 230Vac, 50Hz (with a 115Vac, 60Hz option available). Power Consumption: Standby: Approximately 60VA to 120VA. In Operation: Up to 300VA to 345VA. Logic Voltage: Operates on 24V DC .
Use a precision spirit level on the top chassis of both cabinets. Insert metal shims under the base plates until both cabinets are perfectly level along both the X and Y axes. If it opens, troubleshoot your access control reader wiring
A stable, perfectly level floor is critical for the alignment of the optical sensors and the synchronization of the moving glass leaves.
Place metal leveling shims under the cabinet chassis until the units are perfectly vertical and horizontally level. Use a spirit level on the top rail. Tighten the anchor bolts to a torque specification of 4. Electrical and Cabling Architecture